400 MW COMBINEDCYCLE POWER PLANT, CPR

SHATURA RUSSIA

Location: Shatura, Russia
Client: Gama Power Systems Engineering and Contracting LNG
Contract Type: Construction- Contractor
Start Date: December 2008
Date of Completion: December 2010
Construction Period: 24 months
Project Status: Completed
Scope of Works: Heat Recovery Steam Generator Works (2.700 ton)

top

Construction

From preconstruction to virtual design and construction, we offer a wide range of services to meet your building needs.

Lump-Sum Contracting

The Construction Manager is not required to provide an estimate or contract cost breakdown and does not typically participate in pre-construction.

Design - Build

Certainty of outcome. It’s why our clients choose us for their most challenging Design/Build projects.

Pre-Construction Services

From engineering to preconstruction, we offer a variety of services and delivery methods.