ZAPSIBNEFTEKHIM (SIBUR), PROPANE DEHYDROGENATION AND POLYPROPYLENE PRODUCTION FACILITY (DGP-2)
TOBOLSK, RUSSIA
Location: Tobolsk, Russia
Client: ZapSibNeftekhim, LLC
Contract type: Construction – Contractor
Start date: May 2024
Estimated Completion date: July 2026
Construction period: 2 years
Project status: Ongoing
Scope of works:
Piping Erection and Prefabrication Works (329.270 wdi) Equipment Erection Works (12.037 t)
Structural Steel Erection Works (16.307 t)
Furnace Erection Works (2.746 t)
Painting Works (111.762 m2)
Fireproofing Works (53.563 m2)
Heat Insulation Works (105.527 m2)
Non-Destructive Testing of Pipeline Joints (10.414 pcs)