ELECTROMETALLURGICAL PLANT

KALUGA RUSSIA

Location: Kaluga, Russia
Client: Gama Industrial Plants Manufacturing and Erection Incorp
Contract Type: Construction- Contractor
Start Date: October 2009
Date of Completion: August 2013
Construction Period: 47 months
Project Status: Completed
Scope of Works:

  • Piping Erection and Prefabrication Works (30.000 wdi)
  • Structural Steel Erection Works (15.000 ton)
  • Cladding Works (16.000 m²)
  • Equipment Erection Works (1.000 ton)
  • Chemical Cleaning of Hydraulic System
top

Construction

From preconstruction to virtual design and construction, we offer a wide range of services to meet your building needs.

Lump-Sum Contracting

The Construction Manager is not required to provide an estimate or contract cost breakdown and does not typically participate in pre-construction.

Design - Build

Certainty of outcome. It’s why our clients choose us for their most challenging Design/Build projects.

Pre-Construction Services

From engineering to preconstruction, we offer a variety of services and delivery methods.