IRKUTSK OIL COMPANY, ETHYLENE CRACKER UNIT AT IRKUTSK POLYMER PLANT
(600 thousand tonnes per annum)
UST-KUT RUSSIA
Location: Ust-Kut, Russia
Client: Irkutsk Oil Company LLC (also INK)
Contract Type: Construction-General Contractor
Start Date: July 2022
Estimated Completion Date: October 2024
Construction Period: 27 Months
Project Status: Ongoing
Scope of Works:
Piping Erection and Prefabrication Works (220.000 wdi)
Furnace Erection Works (3.456 t)
Furnace Piping Works (4.700 wdi)
Structural Steel Erection Works (10.875 t)
Equipment Installation Works (1.657 t)
Civil Works (12.420 m3)
Cladding Works (29.667m2)
Painting Works (52.575 m2)
Insulation Works (65.415 m2)
Electrical Works: Cable & Cable Trays Laying, Grounding (1.539.479 m)
Electrical Works: Instrumentation, Switchgear Panels, Interior Lighting (27.752 pcs)