FERTILIZER PLANT

MARY TURKMENISTAN

Location: Mary, Turkmenistan
Client: Renaissance Heavy Industries
Contract Type: Construction- Contractor
Start Date: October 2011
Date of Completion: December 2013
Construction Period: 26 months
Project Status: Completed
Scope of Works:

  • Piping Erection and Prefabrication Works (155.000 wdi)
  • Structural Steel Erection Works (4.200 ton)
  • Cladding Works (Sandwich and Trapeze) (7.500 m²)
  • Equipment Erection Works (650 ton) such as,

      Air Cooled Heat Exchangers Erection Works
      Bagging Building Equipment Works
      Conveyor System Erection Works
      Overhead Crane Erection Works

top

Construction

From preconstruction to virtual design and construction, we offer a wide range of services to meet your building needs.

Lump-Sum Contracting

The Construction Manager is not required to provide an estimate or contract cost breakdown and does not typically participate in pre-construction.

Design - Build

Certainty of outcome. It’s why our clients choose us for their most challenging Design/Build projects.

Pre-Construction Services

From engineering to preconstruction, we offer a variety of services and delivery methods.