MURMANSK ARCTIC LNG-2 GRAVITY- BASED STRUCTURE-1 PROJECT
MURMANSK RUSSIA
Location: Murmansk, Russia
Client: SAREN JV (Saipem Renaissance Venture)
Contract Type: Construction- Contractor
Start Date: December 2020
Estimated Completion Date: February 2023
Construction Period: 26 months
Project Status: Ongoing
Scope of Works:
- Piping Erection and Prefabrication Works (109.000 wdi)
- Structural Steel Erection Works (6.703 ton)
- Equipment Erection Works (1.295 ton)