MURMANSK ARCTIC LNG-2 AWP-1B PROJECT

MURMANSK RUSSIA

Location: Murmansk, Russia
Client: Renaissance Heavy Industries
Contract Type: Construction- Contractor
Start Date: December 2020
Date of Completion: February 2023
Construction Period: 26 months
Project Status: Completed
Scope of Works:

  • Piping Erection and Prefabrication Works (34.000 wdi)
  • Structural Steel Erection Works (7.026 ton)
  • Subdeck Fabrication Works (702 ton)
  • Piping Fabrication Works (75.573 wdi)
  • Piping Support Fabrication Works (150 ton)

top

Construction

From preconstruction to virtual design and construction, we offer a wide range of services to meet your building needs.

Lump-Sum Contracting

The Construction Manager is not required to provide an estimate or contract cost breakdown and does not typically participate in pre-construction.

Design - Build

Certainty of outcome. It’s why our clients choose us for their most challenging Design/Build projects.

Pre-Construction Services

From engineering to preconstruction, we offer a variety of services and delivery methods.