RECONSTRUCTION AND TECHNICAL RE-EQUIPPING OF PROPANE DEHDROGENATION PLANT AT ZABSIBNEFTEKHIM LLC
TOBOLSK, RUSSIA
Location: Tobolsk, Russia
Client: ZapSibNeftekhim, LLC
Contract type: Construction–General Contractor
Start date: November 2023
Estimated completion date: September 2024
Construction period: 10 months
Project status: Ongoing
Scope of works:
Piping erection and prefabrication works (12.495 wdi)
Equipment erection works (193 t)
Structural steel erection works (185 t)
Cladding works (100 m2)
Painting works (1.285 m2)
Insulation works (4.729 m2)
Electrical works (32.369 m)
Dismantling piping (797 m)
Dismantling steel structure (81 t)
Dismantling equipment (53 t)
Dismantling cable way (6.825 m)