KAZANORGSINTEZ (SIBUR), RECONSTRUCTION OF REACTOR “B” OF HDPE PLANT

KAZAN TATARSTAN RUSSIA

Location: Kazan,Tatarstan, Russia
Client: PJSC KAZANORGSINTEZ (SIBUR)
Contract Type: Construction – General
Contractor Start Date: February 2023
Estimated Completion Date: July 2024 Construction Period: 1 year 5 months
Project Status: Ongoing
Scope of Works:
Piping Erection and Prefabrication Works (20.785 wdi) Equipment Erection Works (556 ton)
Civil Works (903 m3)
Structural Steel Erection Works (493 ton)
Painting Works (27.269 m2)
Insulation Works (2.777 m2)
HVAC Works (2.295 m2)
Electrical Works (103.000 m)

top

Construction

From preconstruction to virtual design and construction, we offer a wide range of services to meet your building needs.

Lump-Sum Contracting

The Construction Manager is not required to provide an estimate or contract cost breakdown and does not typically participate in pre-construction.

Design - Build

Certainty of outcome. It’s why our clients choose us for their most challenging Design/Build projects.

Pre-Construction Services

From engineering to preconstruction, we offer a variety of services and delivery methods.