AMUR GAS PROCESSING PLANT

SVOBODNY RUSSIA

Location: Svobodny, Russia
Client: Renaissance Heavy Industries
Contract Type: Construction- Contractor
Start Date: September 2018
Date of Completion: December 2021
Construction Period: 40 months
Project Status: Completed
Scope of Works:

  • Piping Erection and Prefabrication Works (700.000 wdi)
  • Structural Steel Erection Works (13.000 ton)
  • Cladding Works (50.000 m2)
  • Steam Tracing Works (125.000 m)
  • Flare Erection Works (650 ton)
top

Construction

From preconstruction to virtual design and construction, we offer a wide range of services to meet your building needs.

Lump-Sum Contracting

The Construction Manager is not required to provide an estimate or contract cost breakdown and does not typically participate in pre-construction.

Design - Build

Certainty of outcome. It’s why our clients choose us for their most challenging Design/Build projects.

Pre-Construction Services

From engineering to preconstruction, we offer a variety of services and delivery methods.