RUSVINYL IKRA PROJECT INTEGRATED VINYLS PLANT

NIZHNY NOVGOROD RUSSIA

Location: Nizhny Novgorod, Russia
Client: Renaissance Heavy Industries
Contract Type: Construction- Contractor
Start Date: May 2012
Date of Completion: 22 months
Construction Period: 21 months
Project Status: Completed
Scope of Works:

  • Piping Erection and Prefabrication Works (100.000 wdi)
  • Structural Steel Erection Works (3.000 ton)
  • Cladding Works (7.000 m²)
  • Equipment Erection Works (330 ton)
  • Insulation Works (30.000 m²)
top

Construction

From preconstruction to virtual design and construction, we offer a wide range of services to meet your building needs.

Lump-Sum Contracting

The Construction Manager is not required to provide an estimate or contract cost breakdown and does not typically participate in pre-construction.

Design - Build

Certainty of outcome. It’s why our clients choose us for their most challenging Design/Build projects.

Pre-Construction Services

From engineering to preconstruction, we offer a variety of services and delivery methods.